O
Weslaco
← Weslaco

Weslaco · issues

Civic issues

Topics getting the most attention in Weslaco public meetings, ranked by how frequently they come up.

6 issues (filtered)13 topics
MediumRoads

Railroad Street crossing fix with STC

The city and South Texas College will split the cost of fixing the rough railroad crossing on Railroad Street — about $60,365 total. Waiting on STC's board to sign.

1 mentionLast discussed Sep 15, 2026
MediumRoads

18th Street repaving

A one-mile mill-and-overlay of 18th Street is going out to bid, with the city aiming to schedule construction during the Christmas school break to spare Memorial School traffic.

1 mentionLast discussed Aug 18, 2026
MediumRoads

Boundary Road Paving Partnership with Mercedes

Weslaco and Mercedes signed a framework to split costs on paving shared boundary roads, starting with Mile 2 1/2 West Road. Each project still comes back to the Commission for a specific vote, and Mayor Gonzalez stressed no city money moves until all parties pay their share.

1 mentionLast discussed Aug 4, 2026
MediumRoads

18th Street and Milanos Road intersection safety

A crash-prone intersection is getting a $28,725 traffic study, with commissioners noting frequent accidents and the future Weslaco loop possibly routing down Milanos by 2034.

1 mentionLast discussed Mar 18, 2026
MediumRoads

Neighborhood Street Paving Near Library

Four streets — Illinois, 5th, Oregon, and Gray Lane — will be repaved for up to $200,000, with work phased around the library construction. Oregon and Gray Lane could start within weeks.

1 mentionLast discussed Feb 4, 2026
MediumRoads

Cemetery culvert safety hazard

The culvert crossing at Weslaco Cemetery is literally splitting — a 4-inch gap with the ground collapsing. Engineering interns designed the fix: new pipe, wider road, guardrail. Construction awaits approval and cost estimates.

1 mentionLast discussed Jan 20, 2026